A concrete base has been put down to stop the plinth rotting and add stability. Each plinth section had to be drilled and then with help lifted onto the steel rods.
Today we were drilling holes to concrete the steel supports into the ground. Thank you Barry for all your help. The logs on the ground will form the plinths for the sculptures.